top of page

Spain 2023.

Railway project. Section: Castejón - Logroño

Client:

ADIF.

Service:

Informative Study of the Track Platform

Description:

  • Study of Alternatives (x3).

  • Length of the alternatives: 44 - 45.36 mi. (approx.)

  • Project speed = 124 mi/h.

  • Track platform: Both and one way.


  • Viaducts: 4 (0.62 + 0.55 + 0.99 + 0.93 mi.)

  • Tunnels: 4 (2.36 + 2.36 + 5.09 + 2.92 mi.)

  • Overpasses: 4 units.

bottom of page