top of page
![INFRAESTRUCTURAS-DEL-TRANSPORTE-02-Soterramiento-A-42.png](https://static.wixstatic.com/media/f7ef38_09e87ddb83a941c8987940445a956030~mv2.png/v1/fill/w_49,h_23,al_c,q_85,usm_0.66_1.00_0.01,blur_2,enc_auto/f7ef38_09e87ddb83a941c8987940445a956030~mv2.png)
INFRAESTRUCTURAS-DEL-TRANSPORTE-02-Soterramiento-A-42.png
![INFRAESTRUCTURAS-DEL-TRANSPORTE-02-Soterramiento-A-42.png](https://static.wixstatic.com/media/f7ef38_09e87ddb83a941c8987940445a956030~mv2.png/v1/fill/w_49,h_23,al_c,q_85,usm_0.66_1.00_0.01,blur_2,enc_auto/f7ef38_09e87ddb83a941c8987940445a956030~mv2.png)
INFRAESTRUCTURAS-DEL-TRANSPORTE-02-Soterramiento-A-42.png
1/1
Spain 2012.
Platforms reserved for public transport in dual carriageway A-42. Section: M-45 & M- 50 (Madrid)
Client:
Ministerio de Fomento.
Service:
Layout and Construction Design.
Description:
Detail project: Submergence of the Highway A-42 as it passes through the municipality of Getafe.
Total length/Submerged/Buried: 3.60 mi / 2.60 mi.
Links: 4 units. Overpasses.: 5 units.
Transversal crosses on slabs: 10 units.
Public transport boarding ramps: 6 units.
Drainage works: 2 Pumping wells.
Emergency exits: 74 units.
bottom of page