top of page

USA 2022.

“Parallell Thimbel Tunnel” Chesapeake Bay (U.S.A.)

Client:

DRAGADOS USA.

Service:

Review of different design packages.

Description:

  • Length: 9.94 mi. Under the sea.

  • The work consists of reviewing the different design packages for the construction company.

  • Technical review of the tender basis project.

  • Interim design review: more detailed analyses are developed, including simplified calculations of the most representative elements, for the formulation of solutions and alternatives to the original design.

  • Review of the final detail project.

  • Pilots, covers and demolitions.

  • Plan of Instrumentation.

bottom of page