top of page

Navarra, Spain 2009.

Itoiz Dam

Client:

Ebro Hydrographic Confederation

Service:

Control and Supervision of works

Description:

  • Maximum height of the dam: 400.2 ft

  • Coronation length: 1722.4 ft

  • Reservoir volume: 418 hm3


  • Spillway flow: 1345 ft3/s

  • Volume of concrete: 869.9 mi3

  • Probable movements of the slopes

bottom of page