top of page

Spain 2018.

High Speed Railway Project.

Client:

ADIF.

Service:

Project of Construction and Platform Details.

Description:

  • Platform length: 7.58 mi.

  • Project Speed: 205 mi/h.

  • Viaducts: 2 units (813.64 yd + 214.34 yd).

  • Tunnels: 1 unit (307.30 yd).

  • Overpasses / Subways: 7/11 units.

  • Traced over a floodable area.

  • Study of noise and vibrations.

bottom of page