top of page
![INFRAESTRUCTURAS-DEL-TRANSPORTE-16-Tuneles-Alaskan-Way.png](https://static.wixstatic.com/media/f7ef38_8db2141cc6214f7ab7750373205f87c6~mv2.png/v1/fill/w_980,h_454,al_c,q_90,usm_0.66_1.00_0.01,enc_auto/f7ef38_8db2141cc6214f7ab7750373205f87c6~mv2.png)
INFRAESTRUCTURAS-DEL-TRANSPORTE-16-Tuneles-Alaskan-Way.png
![INFRAESTRUCTURAS-DEL-TRANSPORTE-16-Tuneles-Alaskan-Way.png](https://static.wixstatic.com/media/f7ef38_8db2141cc6214f7ab7750373205f87c6~mv2.png/v1/fill/w_980,h_454,al_c,q_90,usm_0.66_1.00_0.01,enc_auto/f7ef38_8db2141cc6214f7ab7750373205f87c6~mv2.png)
INFRAESTRUCTURAS-DEL-TRANSPORTE-16-Tuneles-Alaskan-Way.png
1/1
USA 2012.
Alaskan Way Tunnel Sr99. Seattle (USA)
Client:
HNTB Corporation.
Service:
Tender Project in Offer and Collaboration in the drafting of the Detail Project..
Description:
Procurement in the tendering phase.
Collaboration with the main engineering in the drafting of the detail project.
Length: 1755.9 mi in TBM and 0.39 yd in fake tunnel.
Øint ≈ 17.3 yd, Excavated in geotechnically difficult terrain.
Øexcav = 19.17 yd (world record).
Initial well and tunnel boring machine exit.
Urban tunnel excavated under the city's most important buildings.
bottom of page